Detailed/More Info:
Moon Anchor Mine
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 37)
Type/Category of Info:
Article
Info Source From:
Electricity. Volume: 17 [XVII], Issue No. 8
Info Publication Date:
August 30, 1899
Info found on page:
122
Info Title:
Moon Anchor Mine Use Colorado Electric Power
Colorado Springs, Col.—According to the "Gazette" the Colorado Electric Power Company has as a large user the Moon-Anchor, with a 100 horse power motor of electrical pump.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.04.2024 (19:56:39)
Above Info was First Seen 19.02.2012

Type/Category of Info:
General Mining News
Info Source From:
The New Castle News. Volume: 4 [IV], Issue No. 9
Info Publication Date:
March 14, 1896
Info found on page:
2
Info Title:
Moon-Anchor Shipment
The Cripple Creek correspondent of the Rocky Mountain News writes his paper as follows.
graphic for visual presentation of text
graphic for visual presentation of text A shipment of ninety tons was made yesterday from the Moon-Anchors, on Gold hill, which is estimated to be worth about $70 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.04.2024 (08:14:07)
Above Info was First Seen 11.09.2011

Type/Category of Info:
General Mining News
Info Source From:
The Morning Times. Volume: 3 [III], Issue No. 271
Info Publication Date:
March 1, 1896
Info found on page:
1
Info Title:
Moon-Anchor Has Fine Specimens
The Moon-Anchor Has It Bigger
graphic for visual presentation of text——————
graphic for visual presentation of text Some fine specimens of ore taken from the Moon-Anchor on Gold hill are pronounced by an experienced mining man to contain calevernite, a class of ore that is 12 per cent richer than sylvanite.
graphic for visual presentation of text This company will begin paying dividends in April.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 06.03.2024 (10:02:14)
Above Info was First Seen 06.03.2024

Type/Category of Info:
Mining Inquiries
Info Source From:
United States Investor. Volume: 10 [X], Issue No. 9
Info Publication Date:
March 4, 1899
Info found on page:
301
Info Title:
Moon-Anchor Co. Info
The Moon-Anchor is now practically owned in London, England, where its shares will be sold, and it is therefore no longer an American institution.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.02.2024 (10:23:11)
Above Info was First Seen 08.02.2024

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 2
Info Publication Date:
July 11, 1908
Info found on page:
68
Info Title:
Moon-Anchor Dump Lessees McCall & Co. Shipment
Cripple Creek—The Moon and Anchor dump on Gold hill, formerly considered of little value, is now being worked at a profit by Thomas McCall and associates, leasers. They are stripping one car a day. The ore has increased in value as greater depth has been gained, from $8 to better than $14 to the ton. The ore is now being sorted and the first carload of this sorted ore has been shipped and is expected to run about $20 to the ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 29.12.2023 (08:42:37)
Above Info was First Seen 29.12.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 29 [XXIX], Issue No. 1
Info Publication Date:
July 4, 1908
Info found on page:
32
Info Title:
Moon-Anchor Dump Lessees McColl & Co. Shipment to Standard Mill
Cripple Creek—Thomas McColl and others, leasing on the dumps of the Moon-Anchor mine on Gold hill, recently shipped in a single day 378 tons to the Standard mill of the United States Reduction & Refining Co. at Colorado City. This makes a total of 1,560 tons shipped since June 1.
graphic for visual presentation of text The shipments, which were of unsorted rock, gave returns of from $6.40 to $15.60 to the ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.12.2023 (15:37:01)
Above Info was First Seen 28.12.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 19
Info Publication Date:
May 11, 1907
Info found on page:
607
Info Title:
Moon Anchor Lessee Peachy Shipment
Denver.—A carload shipment of $50 ore has been sent out by lessee Peachy, operating at surface in the main shaft of the Moon Anchor on Gold hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.11.2023 (09:09:12)
Above Info was First Seen 20.11.2023

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 26 [XXVI], Issue No. 9
Info Publication Date:
March 2, 1907
Info found on page:
312
Info Title:
Moon Anchor Lessees Stacy & Co. Opened Vein at 400 Feet
Denver.—A vein 3 feet wide has been opened by Stacy & Company in the Moon Anchor on Gold hill at a depth of 400 feet. It carries a little over 3 ounces per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 13.11.2023 (08:18:47)
Above Info was First Seen 13.11.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 45
Info Publication Date:
February 4, 1905
Info found on page:
2
Info Title:
Moon-Anchor to Sink Deeper
The Moon-Anchor mine on Gold Hill is to be explored by the sinking of the shaft 90 feet to a total depth of 990 feet, and by laterals. This mine yielded $1,000,000 from one ore body.
graphic for visual presentation of text A large body of $20 ore has recently been opened in the mine by lessees.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 09.10.2023 (09:17:15)
Above Info was First Seen 09.10.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 3 [III], Issue No. 12
Info Publication Date:
June 20, 1903
Info found on page:
2
Info Title:
Moon Anchor to Sink Further
An officer of the Moon Anchor company is authority for the statement that the big three-compartment shaft on that property will be sunk an additional 250 feet, 1060 feet in all, in an effort to locate the lost ore shoot, which, prior to 1898, produced a million dollars in gold.
graphic for visual presentation of text The shoot was lost at the 500 foot point, but it is thought that it will again appear when bed rock is reached.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.08.2023 (09:09:04)
Above Info was First Seen 27.08.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2499; 24
Info Publication Date:
June 13, 1908
Info found on page:
790-791
Info Title:
Moon Anchor Rich Strike at 250 Feet
A rich strike is reported at the 250 ft. level of the Cobb shaft on the Moon Anchor.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.08.2023 (23:50:17)
Above Info was First Seen 08.08.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 96 [XCVI], Issue No. 2496; 21
Info Publication Date:
May 23, 1908
Info found on page:
687
Info Title:
Moon-Anchor Dump Being Shipped
Three sets of lessees are shipping ore from the dumps of the Moon-Anchor.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 07.08.2023 (21:44:45)
Above Info was First Seen 07.08.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1692
Info Publication Date:
June 27, 1912
Info found on page:
xxv + xxvii
Info Title:
Moon Anchor Mine Resume Operations
Operations have been resumed on the Moon-Anchor mine on Gold hill, and ore is being hauled out to the Cripple Creek loading station.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.07.2023 (01:51:47)
Above Info was First Seen 02.07.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1687
Info Publication Date:
May 23, 1912
Info found on page:
xxxiv
Info Title:
Moon-Anchor Expected to Start Up Again Soon
It is expected the Moon-Anchor plant will be steamed up soon, as it appears satisfactory arrangements have been made for the starting up of the works.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.06.2023 (08:42:27)
Above Info was First Seen 15.07.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1636
Info Publication Date:
June 8, 1911
Info found on page:
604
Info Title:
Moon Anchor Work Resumed at 1068 Feet
Work has been resumed in crosscutting to the east and west from the 1,068-ft. level in the Moon Anchor.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.05.2023 (19:44:53)
Above Info was First Seen 19.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1634
Info Publication Date:
May 25, 1911
Info found on page:
556
Info Title:
Moon Anchor Crosscut Expectations
It is expected that the crosscut being run east of the shaft in the Moon Anchor on Gold hill at a depth of 1,068 ft. will open the main vein from which the bulk of the production from this property was made in the best days of this mine.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 18.05.2023 (08:02:28)
Above Info was First Seen 18.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 63 [LXIII], Issue No. 1616
Info Publication Date:
January 19, 1911
Info found on page:
73
Info Title:
Moon-Anchor Want Shaft Sinking Bids
At the Moon-Anchor bids for sinking the shaft to 1,100 ft. will be received, and the mine will be leased from the 800-ft, level to surface. The entire mine has been blocked out.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 08.05.2023 (09:24:17)
Above Info was First Seen 08.05.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1610
Info Publication Date:
December 8, 1910
Info found on page:
558
Info Title:
Moon-Anchor Gets Big Hoist and Other Improvements
The big hoist of the Moon-Anchor is being installed and when ready for work the shaft will be repaired and probably sunk 500 ft.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.05.2023 (10:10:11)
Above Info was First Seen 12.07.2010

Type/Category of Info:
Industrial/Construction Notes
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1608
Info Publication Date:
November 24, 1910
Info found on page:
502-503
Info Title:
Moon-Anchor Changed Hoists to Reach Deeper
The F. M. Davis Iron Works Co. recently changed the Moon-Anchor hoist from flat rope to round rope so that a depth of 2,000 ft. may be gained.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.05.2023 (08:16:27)
Above Info was First Seen 11.07.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1605
Info Publication Date:
November 3, 1910
Info found on page:
428-429
Info Title:
Moon-Anchor Shaft to Reopen Soon Due to Deep Drainage Tunnel
Immediately upon the completion of the deep drainage tunnel, which should come in a few days, and the consequent lowering of the water, the Moon-Anchor will be one of the first to take advantage of it.
graphic for visual presentation of text This shaft has been closed by the company more than a year.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.04.2023 (14:28:43)
Above Info was First Seen 11.07.2010

Type/Category of Info:
Personals
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1592
Info Publication Date:
August 4, 1910
Info found on page:
111
Info Title:
Mr. J. R. McKinnie to Sink Moon Anchor Shaft to 1,500 Ft.
J. R. McKinnie has returned to Colorado Springs after an absence of several months in California, and it is reported that he will start sinking the Moon Anchor shaft to a depth of 1,500 ft.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.04.2023 (21:02:50)
Above Info was First Seen 25.04.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 62 [LXII], Issue No. 1591
Info Publication Date:
July 28, 1910
Info found on page:
90-91
Info Title:
Moon-Anchor Co. Happenings
Important development of property of the Moon-Anchor Co., consisting of the New Moon, Little Annie Rooney, Chance and portions of the Anchor and Anchor No. 2 claims on Gold hill, known as the Moon-Anchor mine, will be undertaken on company account about August 1.
graphic for visual presentation of text For several years the mine has been operated by leasers. The directors will sink the main shaft, now down 960 ft., an additional 200 ft. and possibly deeper, and will put on a hoisting plant to lift ore 2,000 ft.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.04.2023 (12:34:57)
Above Info was First Seen 11.07.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 12
Info Publication Date:
September 17, 1908
Info found on page:
237
Info Title:
Moon-Anchor-Conundrum Leasing Co. Organized and at Work
A new company, under the name of the Moon-Anchor-Conundrum Leasing Co., has been organized for the purpose of operating the Moon-Anchor and the Conundrum properties, and has started a crosscut on the 1,000-ft. level of the Moon-Anchor to connect with the workings of the Conundrum.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.04.2023 (19:28:46)
Above Info was First Seen 15.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 10
Info Publication Date:
September 3, 1908
Info found on page:
197
Info Title:
Moon Anchor Property Ships From Old Dumps
The Moon Anchor property on Gold hill is shipping from the old dumps. Five teams are now engaged in hauling ore from this property.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.04.2023 (08:56:09)
Above Info was First Seen 15.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 4
Info Publication Date:
July 23, 1908
Info found on page:
76
Info Title:
Moon Anchor Been Retimbered
The Moon Anchor main shaft has been retimbered throughout and will be turned over to the company's representative in a very few days.
graphic for visual presentation of text It is understood that extensive developments will be carried on, as soon as the work is accepted.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 01.04.2023 (07:54:46)
Above Info was First Seen 14.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 58 [LVIII], Issue No. 1
Info Publication Date:
July 2, 1908
Info found on page:
16
Info Title:
Moon Anchor Dump Shipments
The average values of the shipments from the dump of the Moon Anchor property have been increasing, and from $7 to $8. the original value, now reaches from $12 to $14 per ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 20.03.2023 (12:34:55)
Above Info was First Seen 13.06.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 49 [XLIX], Issue No. 2
Info Publication Date:
January 14, 1904
Info found on page:
43
Info Title:
Moon-Anchor Do Dig Deeper
Moon-Anchor.—The 800-foot shaft is being sunk deeper, the purpose being to continue to the 1,000-foot level. The property is situated on Gold Hill and it is anticipated that this depth may be reached without encountering a heavy flow of water.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.08.2022 (08:37:07)
Above Info was First Seen 25.08.2022

Type/Category of Info:
Article
Info Source From:
The Mineral Industry, Its Statistics, Technology & Trade in the U.S. and Other Countries. Volume: 6 [VI]
Info Publication Date:
September 1898
Info found on page:
264
Info Title:
Moon-Anchor 1897 Production
The 1897 production was approximately for the Moon-Anchor 3,400 tons.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.05.2022 (14:57:35)
Above Info was First Seen 07.05.2010

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 26
Info Publication Date:
December 24, 1910
Info found on page:
1276
Info Title:
Moon-Anchor Lessees Installed New Plant
Moon-Anchor—This Gold Hill mine was not a rich producer in the early days, but like its next-door neighbor, the Anchor-Leland, its best ore was above the 300 level.
graphic for visual presentation of text A new plant has now been installed by lessees and a shaft will be sunk from the 900- to the 1200-ft. point.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.12.2021 (16:24:18)
Above Info was First Seen 26.03.2010

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 90 [XC], Issue No. 5
Info Publication Date:
July 30, 1910
Info found on page:
230
Info Title:
Mon-Anchor to Resume Work Due to Drainage Tunnel
Denver, July 25—The approaching connection of the deep drainage tunnel with the El Paso workings, and the expected unwatering of most of the deep mines of Cripple Creek, is stimulating new operations in a large degree.
graphic for visual presentation of text One instance of this is the Moon-Anchor, on Gold hill, which has produced $1,500,000 in the past, and struck water at 960 ft. Work is to be resumed on company account about Aug. 1.
Notes/Text been Edited:
Abstracted from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 19.12.2021 (10:17:12)
Above Info was First Seen 19.12.2021

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
The Engineering and Mining Journal. Volume: 80 [LXXX], Issue No. 21
Info Publication Date:
November 25, 1905
Info found on page:
991
Info Title:
Fitch lease on Moon-Anchor Doing Work
Cripple Creek, Nov. 18— A number of new leases are starting operations in various parts of the district. On Gold hill the old Moon-Anchor is doing some work on what is known as the Fitch lease.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 25.08.2021

Type/Category of Info:
General Mining News
Info Source From:
The Morning Times. Volume: 5 [V], Issue No. 326
Info Publication Date:
May 1, 1898
Info found on page:
5
Info Title:
Moon Anchor Shipments
SOME OF THE WEEK'S SHIPMENTS.
graphic for visual presentation of text—————————
graphic for visual presentation of textWEEKLY SHIPMENTS
graphic for visual presentation of text—————————
graphic for visual presentation of textSome of the Ore Sent Out From Cripple's Mines.
graphic for visual presentation of text Moon Anchor—Total shipments, 180 tons, consisting of 120 tons smelting ore and 60 tons of mill ore.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 28.02.2021

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 10 [X], Issue No. 18
Info Publication Date:
November 21, 1901
Info found on page:
2
Info Title:
Moon-Anchor Important Ore Development
An important ore development has occurred in the lowest workings of the Moon-Anchor mine, approximately 900 feet below the ground. The company will immediately put diamond drills to work in the floor of the level. The officers are non-committal, stating that they have something there, but do not know exactly what it is.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 04.07.2020

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 77 [LXXVII]
Info Publication Date:
January 14, 1904
Info found on page:
96
Info Title:
Moon Anchor Sinking Steadily
Moon Anchor.->This company is steadily sinking the main shaft, and is down 865 ft., but will continue to the 1,000-ft. point, unless barred by water.
graphic for visual presentation of text An occasional shipment of average grade mill ore is made.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 20.02.2019

Type/Category of Info:
Article
Info Source From:
The Mining and Scientific Press. Volume: 107 [CVII], Issue No. 19
Info Publication Date:
November 8, 1913
Info found on page:
734
Info Title:
Depth of the Moon Anchor
Moon Anchor, Gold Hill, is now 1100 feet.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text of a list compiled by the Cripple Creek Times-Record.
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 20.11.2019

Type/Category of Info:
Personals
Info Source From:
The Morning Times. Volume: 7 [VII], Issue No. 270
Info Publication Date:
October 15, 1899
Info found on page:
1
Info Title:
Mr. W. P. Cobb in Camp
Mr. W. P. Cobb is up from the Springs and will likely once more take charge of the Moon-Anchor.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 01.08.2019

Type/Category of Info:
Article
Info Source From:
The Colliery Engineer and Metal Miner. Volume: 17 [XVII], Issue No. 11
Info Publication Date:
June 1897
Info found on page:
482
Info Title:
Moon Anchor Vein/Ore-Shoot Description
In the Moon Anchor the ore-shoot is 70 feet long, width of pay streak 3 feet lying on the hanging wall. The vein shows slickensides.
Notes/Text been Edited:
Abstracted, partly restructured from source Article about Ore-Shoots in Cripple Creek
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 27.06.2019