Detailed/More Info:
Eclipse No. 1 {aka New Haven Mine]
This is a hidden text,
acting just like a spacer
type of text in order to
push the Entity info
down on the page. Sorry to have wasted your time/ear to listen to this, I was just trying to get a layout work like I wanted.
Info Database Last Updated 08.04.2024 (Entity News entries: 21)
Type/Category of Info:
General Mining News
Info Source From:
The Omaha Daily Bee. Volume: 22 [XXII], Issue No. ?
Info Publication Date:
January 15, 1894
Info found on page:
5
Info Title:
Eclipse No. 1 in High Grade Ore
Ore assaying $7,700 and $6,300 in gold has been struck in the Eclipse No. 1, Cripple Creek, where work was resumed only last week.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.03.2024 (21:30:42)
Above Info was First Seen 08.09.2011

Type/Category of Info:
Mining Inquiries
Info Source From:
United States Investor. Volume: 11 [XI], Issue No. 17
Info Publication Date:
April 28, 1900
Info found on page:
556
Info Title:
New Haven Gold Mining Co. Info
The New Haven Gold Mining Co. belongs on a selected list, by no means complete, of low-priced Cripple Creek stocks, with the latest published information as to location, acreage, capitalization, and approximate present price being: Raven Hill, Cripple Creek; 8½ acres; capital, 1,500,000 shares: par value, $1; stock in treasury, 235,000; price, 8½ cents.
graphic for visual presentation of text The low-priced stocks are usually sold in "board lots" of not less than 1,000 shares. Smaller lots are also not readily salable. Shares in the Royalty can be obtained in lots of not less than 500.
Notes/Text been Edited:
Abstracted and slightly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.02.2024 (11:35:37)
Above Info was First Seen 27.02.2024

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 3 [III], Issue No. 4
Info Publication Date:
April 25, 1903
Info found on page:
2
Info Title:
New Haven Main Shaft to Sink Further
The main working shaft of the New Haven on Raven Hill is being sunk an additional 100 feet, and heavier machinery will be added to the present equipment. This lease has been making money for the lessees right along, and they are of the opinion that they have a very good proposition before them.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.08.2023 (20:37:26)
Above Info was First Seen 25.08.2023

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 23
Info Publication Date:
September 3, 1904
Info found on page:
4
Info Title:
New Haven Lessees Stafford and Associates in Rich Ore at 2nd Level
Colorado Springs. Sept. 1. Lessee Stafford and associates, who are operating on the lease of the New Haven property on Raven Hill, have opened up a rich body of ore in the second level.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.09.2023 (08:32:49)
Above Info was First Seen 24.09.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 50 [L], Issue No. 12
Info Publication Date:
September 22, 1904
Info found on page:
307
Info Title:
New Haven in Large Ore Shoot
New Haven.—A permanent ore shoot has been cut in the 200-foot level of this Raven Hill mine. Three shipments have been made which will average close to ten ounces to the ton.
graphic for visual presentation of text The ore breaks seven feet wide and the screenings give good values.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 02.10.2022 (11:00:51)
Above Info was First Seen 01.04.2011

Type/Category of Info:
General Mining News
Info Source From:
PROFITS; A Journal of Finance and Mining Worth While. Volume: 4 [IV], Issue No. 26
Info Publication Date:
September 24, 1904
Info found on page:
4
Info Title:
New Haven Ore Shoot at 200 Feet
Colorado Springs, Sept. 22.—The recent development work in the 200-foot level in the New Haven mine on Raven Hill has progressed so far that the statement is warranted that a permanent ore shoot has been encountered. The new find is the first ore to be opened in this level.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 25.09.2023 (08:10:18)
Above Info was First Seen 25.09.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 50 [L], Issue No. 15
Info Publication Date:
October 13, 1904
Info found on page:
394
Info Title:
New Haven Ships High Grade
New Haven.—A winze which is being sunk from the 200-foot level, shows that the ore body is continuous in depth and of good value. The ore breaks seven feet wide and gives a good grade of screenings.
graphic for visual presentation of text Two shipments of high grade ore was recently made, one giving about ten ounces and the other fifteen ounces of gold to the ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 03.10.2022 (12:18:06)
Above Info was First Seen 02.04.2011

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 50 [L], Issue No. 25
Info Publication Date:
December 22, 1904
Info found on page:
681
Info Title:
New Haven Lessees Secured Extension
New Haven.—Messrs. Stafford and associates, who are operating this property, have secured a year's extension in the lease. It is reported that the lessees have divided among them about $20,000 during the past year.
graphic for visual presentation of text In a winze from the 200-foot level there are three feet of ore, the screenings from which goes as high as eight ounces of gold to the ton. The winze is now down forty feet below the 200-foot level.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 07.10.2022 (20:39:26)
Above Info was First Seen 17.05.2010

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 80 [LXXX], Issue No. 19
Info Publication Date:
November 11, 1905
Info found on page:
902
Info Title:
Possible Apex Litigation Between the Jo Dandy and Eclipse No. 1
There been some talk of apex litigation between the Jo Dandy property on Raven hill and the Eclipse No. 1, which adjoins the Jo Dandy. It is thought that some arrangement will be made, however, to prevent this.
Notes/Text been Edited:
Abstracted and partly rewritten from source text.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 10.10.2021 (18:51:24)
Above Info was First Seen 23.08.2021

Type/Category of Info:
General Mining News
Info Source From:
Mining Reporter. Volume: 53 [LIII], Issue No. 3
Info Publication Date:
January 18, 1906
Info found on page:
70
Info Title:
Part of Eclipse No. 1 Lode to Be Sold
Eclipse.—Negotiations are pending for the sale to the Jo Dandy company of that portion of the Eclipse claim over which the Jo Dandy has the apex. The deal will involve a consideration of about $50,000.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 11.02.2023 (14:09:38)
Above Info was First Seen 31.05.2010

Type/Category of Info:
General Mining News
Info Source From:
The Mining World. Volume: 24 [XXIV], Issue No. 3
Info Publication Date:
January 20, 1906
Info found on page:
69
Info Title:
Jo Dandy Co. Might Buy New Haven Property
Denver, Colo.—The Jo Dandy Gold Mining company is negotiating for the property of the New Haven company adjoining, on the summit of Raven hill.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 27.10.2023 (16:54:48)
Above Info was First Seen 27.10.2023

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2558; 5
Info Publication Date:
July 31, 1909
Info found on page:
139
Info Title:
Eclipse No. 1 Sold
The Eclipse No. 1 claim has been purchased by the Jo Dandy Mining Co. from the New Haven Gold Mining Co. J. M. Wright is manager.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 22.04.2022 (09:37:33)
Above Info was First Seen 22.04.2022

Type/Category of Info:
Special/Editorial Correspondence
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2559; 6
Info Publication Date:
August 7, 1909
Info found on page:
180
Info Title:
Eclipse No. 1 Sold to Jo Dandy for Stock Considerations
DENVER, COLORADO—The Eclipse claim belonging to the New Haven Gold Mining Co. has been sold to the Joe Dandy Mining Co. for a stock consideration. This action settles the dispute over the apex rights of this claim.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.04.2022 (07:19:47)
Above Info was First Seen 23.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2562; 9
Info Publication Date:
August 28, 1909
Info found on page:
277
Info Title:
Joe Dandy & Eclipse No. 1 Claims Soon to Be Leased
J. M. Wright, manager for the Joe Dandy Mining Co., announced that the Jo Dandy and Eclipse No. 1 claims of that company are to be leased shortly.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 23.04.2022 (09:24:52)
Above Info was First Seen 23.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2564; 11
Info Publication Date:
September 11, 1909
Info found on page:
343
Info Title:
Jo Dandy Mining Co. Properties Leased
A. E. Carlton has secured a 3-years' lease on the properties of the Joe Dandy Mining Co. The shaft is being re-timbered and the buildings and ore-bins, which were destroyed by fire last fall, re-placed.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 24.04.2022 (09:02:04)
Above Info was First Seen 24.04.2022

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 88 [LXXXVIII], Issue No. 21
Info Publication Date:
November 20, 1909
Info found on page:
1043
Info Title:
Jo Dandy and New Haven Consolidates
Jo Dandy and New Haven—The companies have compromised the suit over trespass and will consolidate.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 21.05.2019

Type/Category of Info:
General Mining News
Info Source From:
Mining and Scientific Press. Volume: 99 [XCIX], Issue No. 2577; 24
Info Publication Date:
December 11, 1909
Info found on page:
805
Info Title:
Joe Dandy Mining Co. Fixing Shaft and Gives Leases
The Joe Dandy Mining Co. is re-timbering the shaft at the Eclipse No. 1 claim and has let several leases on blocks of ground in the Eclipse and Jo Dandy claims.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.04.2022 (20:52:02)
Above Info was First Seen 30.04.2022

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 64 [LXIV], Issue No. 1641
Info Publication Date:
July 13, 1911
Info found on page:
46
Info Title:
Joe Dandy Opened Large Ore Shoot in New Haven Ground
On the 500-ft. level or present bottom of the Jo Dandy a shoot of ore about 14 ft. wide and 200 ft. long has been opened up and the company is making regular shipments from this place. The shoot lies in the New Haven ground.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 22.05.2023 (09:20:03)
Above Info was First Seen 22.05.2023

Type/Category of Info:
General Mining News
Info Source From:
The Engineering and Mining Journal. Volume: 92 [XCII], Issue No. 3
Info Publication Date:
July 15, 1911
Info found on page:
134
Info Title:
Joe Dandy Opened Large Ore Shoot in New Haven Ground
On the 500-ft. level of the Joe Dandy shaft, a shoot of ore has been opened which lies in the New Haven ground and which was the cause of much litigation, resulting in consolidation of the two companies.
graphic for visual presentation of text All of the ore comes from drifting. This shoot is considered one of the largest in the camp.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 30.10.2020 (11:04:30)
Above Info was First Seen 24.03.2019

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1678
Info Publication Date:
March 28, 1912
Info found on page:
ad34
Info Title:
Joe Dandy to Resume Work
Work will be resumed in the Jo Dandy mine, on Raven hill. The mine was closed down three months ago when an option on control of the stock was given Eastern capitalists.
graphic for visual presentation of text The option will expire April 1. Meantime experts are expected from the East to examine the mine and report to holders of the option. It is said that the option price is $400,000.
graphic for visual presentation of text The value of the mine has been enhanced through consolidation with the New Haven, which was done to avoid litigation over the main ore body on the side line.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 26.06.2023 (20:38:32)
Above Info was First Seen 14.07.2010

Type/Category of Info:
General Mining News
Info Source From:
Mining Science. Volume: 65 [LXV], Issue No. 1682
Info Publication Date:
April 18, 1912
Info found on page:
ad34
Info Title:
Main Jo Dandy Vein Exposed
It will be remembered that litigation between the New Haven Gold Mining Co. and the Jo Dandy Mining Co. was threatened and commenced over extra lateral rights, when a compromise was effected and the Eclipse No. 1 lode mining claim was acquired by the Jo Dandy Mining Co.
graphic for visual presentation of text Prospecting near to the dividing line between the two claims, Manager James Wright has exposed the main Jo Dandy vein, and the mine samples taken across fully 5 ft. of ore have returned values of from $18.29 to $42.20 to the ton.
Internet Source Text Link(s) {Found/Seen/Known]:
Above Info was Last Updated on 28.06.2023 (08:57:19)
Above Info was First Seen 13.07.2010